We were appointed to carry out the enabling works to facilitate the construction of a two storey 60 bed modular ward at the front of the existing entrance on the car park at Whiston Hospital.
We surveyed the existing services and established points of connection for each new supply. We then surveyed the existing feeder pillar and associated cabling and connections.
Following the results, we prepared drawings and a specification to enable the works to be carried out by a local contractor.

