DAMS

Office Showroom

Overview

DAM’s Furniture commissioned the refurbishment of its main office block at Gores Road, Knowsley Industrial Estate. The project was delivered in two phases to allow continuous business operations: Phase 1 created a new meeting room and fully refurbished the first floor, including showroom, server room, offices, WCs and kitchen; Phase 2 decanted staff from the ground floor before carrying out a complete refurbishment of reception, large showroom, projector space, R&D office, kitchen, meeting rooms and staff entrance. The scheme required exposed services to be coordinated to a high standard, ensuring both technical performance and architectural design intent were achieved.

Details

Client: Sefton Council

Architect: Shack Architecture

Contract Value: £750k

M&E Solution

Mechanical works included new mechanical ventilation, VRV heating and cooling systems with Daikin units, electric panel heaters, hot and cold water services, above ground drainage, sanitaryware, controls, and full testing and commissioning. Ventilation systems comprised ceiling-mounted HRUs, twin fan extract systems, ductwork, grilles, dampers and silencers, coordinated for exposed areas with painted finishes to match the architectural scheme. Electrical services included LV mains and sub-mains distribution, containment, general and emergency lighting with controls, small power, mechanical plant wiring, fire alarm, intruder alarm, access control, CCTV, disabled refuge, structured wiring, and lightning protection. All works were specified to current CIBSE, IEE and Building Regulations, with integration to the client’s IT and BMS systems.

We Think You Would Like

Royal Bolton Hospital (ED)

October 8, 2025

Contract Value: £1.2M

Salford Royal Theatres

October 7, 2025

Contract Value £4.5M

Aintree Kitchen NHS

October 6, 2025

Contract Value £4M

Bolton Maternity Theatres

July 28, 2025

Contract Value: £1.2M

Aintree Hospital Entrance & Tower Block

September 28, 2022

Contact Value = £15M

Ashford and St Peters Hospital

January 17, 2022

Contract Value = £10M

Rutherford Diagnostics Centre – Taunton, Somerset

September 28, 2021

Contract Value: £4.1M

Stoddart House – Aintree University Hospital

August 9, 2021

Contract Value: £5M

Burnley General Teaching Hospital

March 22, 2021

Contract Value: £1.1M

Bolton Hospice Wellbeing Hub Refurbishment

December 15, 2020

Contract Value: £500K

Claire House Hospice Atrium

October 20, 2020

Contract Value; £200K

Frimley Park Hospital MRI

March 30, 2020

Contract Value: £1.5M

Scroll to Top