Bolton Maternity Theatres

Bolton NHS

Overview

The scheme involved the installation of new rooftop air handling plant and DX cooling, supported by new distribution boards and electrical containment. The refurbishment also required ceiling removal to gain access to ductwork, necessitating replacement of lighting, fire alarm systems, nurse call, and security services. Close coordination was required to deliver the works in a live hospital environment, ensuring patient safety and uninterrupted operation of adjacent clinical areas. All works were fully designed to Stage 4 by SHA, with the contractor developing installation drawings for approval.

Details

Client: Bolton Hospital NHS Trust

Architect: Ryder Architecture

Main Contractors: MTX Contracts

Contract Value: £1.2M

M&E Solution

SHA provided full mechanical and electrical design services including ventilation and AHU specification, DX cooling, pressure stabilisers, heating systems, and BMS controls, alongside electrical distribution, lighting, fire detection, nurse call, and structured wiring. Our design allowed for phased strip-out and replacement of services, temporary diversions, and compliance with NHS HTMs and Building Regulations. Detailed specifications, tender drawings, and coordination processes ensured that the installation was delivered to a high standard, with systems fully commissioned and integrated into the hospital’s estate infrastructure.

We Think You Would Like

Royal Bolton Hospital (ED)

October 8, 2025

Contract Value: £1.2M

Salford Royal Theatres

October 7, 2025

Contract Value £4.5M

Aintree Kitchen NHS

October 6, 2025

Contract Value £4M

Aintree Hospital Entrance & Tower Block

September 28, 2022

Contact Value = £15M

Ashford and St Peters Hospital

January 17, 2022

Contract Value = £10M

Rutherford Diagnostics Centre – Taunton, Somerset

September 28, 2021

Contract Value: £4.1M

Stoddart House – Aintree University Hospital

August 9, 2021

Contract Value: £5M

Burnley General Teaching Hospital

March 22, 2021

Contract Value: £1.1M

Bolton Hospice Wellbeing Hub Refurbishment

December 15, 2020

Contract Value: £500K

Claire House Hospice Atrium

October 20, 2020

Contract Value; £200K

Frimley Park Hospital MRI

March 30, 2020

Contract Value: £1.5M

Arrowe Park Hospital, New Recovery Unit

March 27, 2020

Contract Value: £650K

Scroll to Top